- Screen Colours:
- Normal
- Black & Yellow
WP-THURSDAY 19th.DECEMBER 2019
Work List for Thursday 19th December 2019
For Thursday's work party : meet at the sheds at the usual time, 8.45am for a 9am start, weather permitting.
Work/jobs that need doing in Gunton Wood :
1. Continue laying new logs as path edging.
2. Use blower, shovels, rakes and brushes to clear leaves from main path and sweep away the mud. All Hands on deck if possible. All Hands on deck if possible.
3. Litter pick wood. (Clear away remaining pumpkins around the wood).
4. Continue clearing main ditch.
5. Way marker posts to put back in.
6. Monitor weed on pond and remove wood thrown into the water.
7. Lay the paving slabs outside no 2 shed. Use the barrow load of sand in the container.
8. Continue putting dowels in the shed for tools.
9. Cut fallen tree in Foxburrow Wood. *
10. Build up hedge at the back of the secret garden using the pine tree spoils.
11.Plant tree whips from School in the hedge near Stubbs Wood / nursery entrance
12. Any other wok as required.
Work/jobs that need doing in Foxburrow Woods:-
1. Litter pick.
2. Remove brambles/blackberry bushes from bluebell area.
3. Repairs to board walks.
4. Cut fallen tree in Foxburrow Wood. *
Regards
GWCP.